Building 3 Design

Building 3 Design
Customer: Amgen
Project Location: Longmont, Colorado
The following were prepared for Building 3:
Load study of utilities for Building 3 and Building 2 to evaluate the feasibility of centralizing utility systems between the two buildings.
Follow-up conceptual design for steam, DI water, clean steam and plant systems in Building 3 were made to establish budgets for the upgrades.








