Project Overview

Harris Group successfully executed the installation of two new double disk refiners for Port Townsend Paper's #2 paper machine, boosting kraft pulp refining capacity to 950 TPD and enabling new product development.

Highlights:

  • Installation of parallel double disk refiners

  • Comprehensive engineering services (process, controls, piping, electrical, structural)

  • Capital cost estimating

 

Our Approach
  • Collaborated closely with the mill from project definition through commissioning

  • Optimized refining parameters and integrated new equipment with existing infrastructure

  • Developed specifications, solicited bids, and provided technical recommendations

  • Created detailed P&IDs, control system integration, and structural designs

  • Implemented power supply for 2250 hp refiner motors

Key Achievements
  • Minimized operational disruption during implementation

  • Tailored solution to meet mill's quality needs and infrastructure constraints

  • Supported the project from Front-End Loading (FEL) through startup

Harris Group's pulp and paper expertise enabled us to deliver a cost-effective design while successfully navigating the challenges of integrating new technology into an existing facility. 

Harris Group: Enhancing production capabilities while maintaining operational efficiency.