Confidential Semiconductor Client - Anhydrous HCl System Design
Confidential Client | Beaverton, OR

Project Overview
Harris Group designed and implemented a comprehensive bulk anhydrous HCl storage and distribution system using tube trailers and Y-Cylinders for a client's existing facility.
Engineering Scope:
Complete P&ID development
Code compliance documentation
Mechanical engineering design
Civil/structural engineering
Electrical system distribution design

Safety & Compliance
Our industrial architectural team ensured adherence to:
Fire code requirements
Building code standards
NFPA regulations
Client's Process Safety Manual (PSM)
Hazardous Materials Inventory Statement (HMIS)
Specialized Equipment
Harris Group managed procurement and bidding for critical components:
Owner Furnished Valve Manifold Boxes (VMBs)
Gas cabinets
HCl emergency scrubber
Double-contained Hastelloy piping

System Components
The installation featured:
New chemical scrubber system
HCl distribution panels
Corrosion-resistant double-contained piping
Specialized exhaust ducting
Truck scale integration
Gas control system modifications
This project demonstrates Harris Group's expertise in designing complex chemical handling systems with rigorous safety and compliance requirements.